Post-Construction & Build-Out Cleaning in DFW

Post-construction cleaning in DFW for builders, GCs and owners: Phase 1–3 cleans for new homes and commercial tenant build-outs, from construction dust to move-in or opening day.

For commercial, post-construction, and hoarding cleaning, we require an onsite assessment before providing a final quote or confirming a service date and time. This allows us to evaluate the property and determine the appropriate scope, team, and equipment. We can schedule your assessment first.

Prefer to text? Text (940) 240-6992 · Free quotes

4.7 on Google (102 reviews) · Insured · Woman-owned · Owner-operated since 2019

Construction leaves behind dust and debris that ordinary cleaning cannot handle. Famous Pink Cleaning offers post-construction cleaning in phases 1–3 for new residential builds and commercial tenant build-outs across Lewisville, Denton County and the Dallas–Fort Worth area, so your project is ready for walkthrough, closing, move-in or opening day.

We work with general contractors, build-out contractors, home builders, realtors and property owners. For homes, that means new builds in growing Denton County master-planned communities, from the Northlake and Aubrey areas up to Celina, custom homes and luxury rebuilds in Flower Mound, Southlake, Westlake and Bartonville, and homes headed to listing or closing. For businesses, it means final cleans after a tenant build-out or finish-out: offices, retail suites, restaurants and other commercial spaces getting ready for the keys to change hands.

Phase 1 is the heaviest cleanup: the rough clean that removes construction debris and heavy dust. Phase 2 is a detailed clean. Phase 3 is the light final clean and touch-up before walkthrough, move-in or opening. Book one phase or all three, at the stages your project needs. The exact scope of each phase is agreed with you after the onsite assessment.

Post-construction rates are per sq. ft.: Phase 1 heavy cleanup $0.55–$0.80+ (minimum $350), Phase 2 detailed clean $0.35–$0.55 (minimum $250) and Phase 3 light final clean $0.30–$0.40 (minimum $250). After-hours work adds 15–25%, rush jobs with less than 72 hours' notice add 20%, and debris removal, windows and floor care are quoted separately. Your final quote is confirmed after an onsite assessment for both homes and commercial tenant build-outs.

Construction work should be complete before final cleaning. Every project schedule is different, so call or text (940) 240-6992 to talk through your project timing and which phases you need. We are a woman-owned, insured team.

Before cleaning: a new commercial kitchen with boxes, plastic wrap and debris.
Before: a brand-new kitchen awaiting cleanup
Before cleaning: a commercial kitchen with packaging and construction debris.
Before: construction mess we were called to tackle
Before cleaning: a black marble floor covered in dust, footprints and construction debris.
Before: a dusty post-construction floor

Where We Offer Post-Construction & Build-Out Cleaning

Serving: Based in Lewisville, our owner-operated, insured team serves builders, general contractors, custom home builders and owners across Dallas–Fort Worth and Denton County, including Southlake, Westlake, Bartonville, Copper Canyon, Double Oak, Flower Mound, Trophy Club, Coppell, Highland Park, University Park (Park Cities), McKinney, Prosper, Frisco, Plano and Lewisville. One DFW team handles every phase, with an onsite assessment before each final quote.

Multifamily lease-up? See Apartment Unit Turnover & Lease-Up Cleaning. Opening a restaurant after the build-out? See Restaurant Pre-Opening & Kitchen Deep Cleaning. More detail: Post-Construction Cleaning in DFW.

What's Included

  • Cleaning in phases 1–3, booked at the stages your project needs
  • New residential builds and commercial tenant build-out final cleans
  • Scope for each phase agreed with you before work begins
  • Paint removal, adhesive removal and construction debris only when included in your agreed scope

What We'll Ask for Your Quote

  • Residential new build or commercial tenant build-out
  • Project address and approximate square footage
  • Project stage and which phases you need
  • Dust and debris levels
  • Whether utilities (electricity and running water) are on
  • Whether the trades have finished
  • Your target walkthrough, closing, move-in or opening date

Every quote is free. Share these details on our quote form or call or text (940) 240-6992, and we'll follow up with your custom quote.

Preliminary Pricing

Preliminary pricing guidance — final quote after onsite assessment

ServiceRate per sq. ft. per visitMinimum
Post-construction: Phase 1 (heavy cleanup)$0.55–$0.80+ per sq. ft.$350
Post-construction: Phase 2 (detailed clean)$0.35–$0.55 per sq. ft.$250
Post-construction: Phase 3 (light final clean)$0.30–$0.40 per sq. ft.$250

Post-construction minimums (per phase): Phase 1 starts at $350, Phase 2 starts at $250, Phase 3 starts at $250. Commercial and tenant build-out final cleans are quoted after an onsite assessment.

After-hours work adds 15–25%. Rush jobs (less than 72 hours' notice) add 20%. Debris removal, windows and floor care are quoted separately.

For commercial, post-construction, and hoarding cleaning, we require an onsite assessment before providing a final quote or confirming a service date and time. This allows us to evaluate the property and determine the appropriate scope, team, and equipment. We can schedule your assessment first.

Large facilities or frequent-service contracts need a tailored quote.

Cleaning services start at the prices shown. Final pricing depends on square footage, property condition, cleaning frequency, and requested services. Additional work will be quoted for approval before it begins.

Schedule an Onsite Assessment

How Booking Works

  1. Reach out. Call, text or send a request with a few details about your property and the cleaning you need.
  2. Schedule your onsite assessment. For commercial, post-construction, and hoarding cleaning, we require an onsite assessment before providing a final quote or confirming a service date and time. This allows us to evaluate the property and determine the appropriate scope, team, and equipment. We can schedule your assessment first.
  3. Get your quote. After the assessment, we follow up with your scope and quote.
  4. Reserve your date. A 20% deposit of the total service cost for your initial cleaning is due after the onsite assessment and your quote are accepted, and secures your date. Recurring commercial cleanings on an established schedule don't need a deposit for each appointment.

Frequently Asked Questions

Do you need to see the property before quoting?

For commercial, post-construction, and hoarding cleaning, we require an onsite assessment before providing a final quote or confirming a cleaning date. This allows us to evaluate the property and determine the appropriate scope, team, and equipment. We can schedule your assessment first.

Do you offer phased post-construction cleaning?

Yes. We offer post-construction cleaning in phases 1–3. Phase 1 is the heavy rough clean, Phase 2 is the detailed clean, and Phase 3 is the light final clean and touch-up.

What does post-construction cleaning cost?

Rates per sq. ft.: Phase 1 heavy cleanup $0.55–$0.80+ (minimum $350), Phase 2 detailed clean $0.35–$0.55 (minimum $250), Phase 3 light final clean $0.30–$0.40 (minimum $250). After-hours work adds 15–25%, rush jobs with less than 72 hours' notice add 20%, and debris removal, windows and floor care are quoted separately. Final quote after onsite assessment.

How is commercial or tenant build-out cleaning priced?

Commercial post-construction and tenant build-out final cleans use the same phase rates and minimums. We confirm your final quote after an onsite assessment of the space and scope.

Do you work with general contractors and build-out contractors?

Yes. We work with GCs, build-out contractors, builders, realtors and property owners. Call or text (940) 240-6992 to talk through your project timing and we will plan the phases around your schedule.

When should we schedule the final clean?

Construction work should be complete before final cleaning. Share your target walkthrough or opening date and we will plan the right phase timing with you.

Related Commercial Services

Schedule your onsite assessment

Prefer to text? Text (940) 240-6992 · Free quotes

4.7 on Google (102 reviews) · Insured · Woman-owned · Owner-operated since 2019

Call NowTextQuoteBook